About Us
ABOUT US
More than 70 years JSC “Uzmetkombinat” is among the manufacturers of metal products. It began its work activity from 5th of March 1944, the start of open-hearth furnace..
In 1994, the Uzbek metallurgical plant as a result of its Association with Shirin machine-building plant and self-management of enterprises “Vtorchermet”, was transformed into an open joint stock company “Uzbek Metallurgical Plant” in accordance with the decree of the Cabinet of Ministers of the Republic of Uzbekistan “On establishment of joint stock company “Uzbek Metallurgical Plant”, dated from 24th of March 1994, No. 159.
All the past years the plant marked a strong belief in the course of technical progress, the construction of new production lines, equipment modernization, innovation, reconstruction. Commissioning (in 1962) of the continuous casting of steel, increasing the capacity of casting ladles, reconstruction of the mill “300” helped to improve operational efficiency, improve product quality.
In the 70s were built and put into operation a steel plant enamelware, arc-furnace plant in the early 80’s began production of long products and billets, the new Rolling Mill number 2. In the 90s were commissioned pipe welding shop and plot producing grinding balls with a diameter of 67 mm and 100 mm.
In accordance with the concept of development of metallurgical industry in the Republic, at the plant develops new products and introduce new objects.
1991 Workshop on production of electric-welded pipes.
1994 Two ball-rolling mill for the production of grinding balls with diameter 67-80mm, with an annual capacity of 100 thousand tons.
1998 Planning permission for the production of glass. The annual capacity of 2 million. Pieces of products.
2001 Reconstruction of the oxygen compressor plant. The annual capacity of 700 thousand. M3 of oxygen. Organization of production of grinding balls with a diameter of 120mm. The annual capacity of 25 thousand tons.
2002 Reconstruction of electric smelting plant. Setting the furnace DSP-100 UMP. The annual capacity of 500 thousand tons.
2006 Organization of production of rolled strips of copper and its alloys. The annual capacity of 3500 thousand tons.
Reconstruction of the shaft lime kiln with an annual capacity of 120 tons.
2007. Organization of rolled rebars on carbide rolls TWS-2.
Extension of the drawing with the production of wire rod with an annual capacity of 6000 tons.
Section for the production of welding electrodes with an annual capacity of 500 tons.
2008. Development of new technologies for processing slag dumps steelmaking with an annual capacity of 8 thousand tons.
Modernization of the ball-rolling mill with increased production of grinding balls SPO-1. With an annual capacity of 160 thousand tons.
Reconstruction of gas cleaning arc furnace DSP-100 CMD.
Reconstruction of the vent path from the arc furnace DSP-100 CMD.
Modernization of electric steel furnace DSP-100 CMD with the replacement of the furnace transformer. The annual capacity of 650 thousand tons.
2009. Reconstruction of reheating furnace rolling shop №2.
Reconstruction of the recovery boiler PAC-75/24 rolling shop №2
Reconstruction of pump-storage station (US).
DSP-100 CMD with replacement power regulator and controller of the arc.
Modernization of electrical substation “Furnace” with the installation of compensating devices and replacement of relay protection.
2010. Modernization of electrical equipment and automated control systems of rolling mill “300” TWS-2.
2011. Organization of production of copper and brass foil. The annual capacity of 2000 tons.
2012. Replacement of obsolete unit K5 №2 on modern air separation unit with an annual capacity of 87.6 million. M3.
Reconstruction of the heating furnace methodical TWS -1 with an annual capacity of 200 thousand tons.
Modernization of copra processing shop 670 thousand. Tons of scrap metal and waste.
Removal of the substation “Metallurgy” 220/110/10 KV with the removal of circuit overhead transmission line 220.110 HF.
2013. Reconstruction of the continuous casting machine (CCM №3 ESMS) with the transition to steel casting section 200×200 mm with the introduction of energy-saving technologies with an annual capacity of 850 thousand tons.
Expansion of production capacity with the construction of plants for liquid steel vacuum unit with the reconstruction of the complex processing of steel with an annual capacity of 150 thousand tons.
JSC “Uzmetkombinat” is the only enterprise of ferrous metallurgy in Central Asia. Plant is a basic sector, is in close connection with all other industries, so the development of the steel industry in the Republic is a top national priority of the current stage of economic development.
Find Out More About Us
With over 15 years of experience under our hard hat, we partner with owners and design professionals to build high-quality projects. Over the years, Builderry has built relationships with the industry’s top craftsmen, suppliers, and subcontractors, all of whom adhere to our high standards of quality.
Creative Ideas
Sed quia non numquam eius modi tempora incidunt ut labore.
Safety First
Sed quia non numquam eius modi tempora incidunt ut labore.
24/7 Support
Sed quia non numquam eius modi tempora incidunt ut labore.
Honorable Award
Sed quia non numquam eius modi tempora incidunt ut labore.
OUR MISSION
As a provider for complex steel structures, we can procure, manufacture and assemble tailor made solutions. Customers approach us because they know that we can handle and machine. assemble tailor made components and solutions driving.
OUR VISION
Our vision is to be the preferred supplier to our customers and, by being preferred supplier, to improve their competitive power. We strive to become and to remain the preferred supplier to all our customers, because this is how we can identify.
1955 - From Birth to a Period of Growth
Nippon Gakki Hamana Factory established in Hamakita-cho (present Hamamatsu city), Hamana-gun, Shizuoka Pref and production of our first product, the 125cc Yamaha motorcycle “YA-1” begins.
1970 - Creation of Demand and New Business
Yamaha Motor Canada Limited (YMCA) founded in Canada. Signed joint venture agreement with Brunswick Co. (U.S.) and Brunswick invests in Sanshin Industries.
2000 - Opening up Limitless Worlds of Potential
Yamaha builds temporary pool “Suimu 21” for the main competition pool of the 9th World Swimming Championships in Fukuoka, Japan Yamaha succeeds in the high-concentration mass culturing.
2010 - Moving further with global operations and monozukuri reforms
Medium-term management plan with central pillars of structural reform and growth strategies announced. Start of increased manufactuaring of Japanese boats to assist Great East Japan Earthquake recovery efforts.
Refer to the statistics of our company. Manufacturer’s high end manufacturing services are a perfect complement to today’s high tech industries.
1
Years Experience
1 +
happy customer
1
distributor
1
factory industrial
Our Teams
William Charles
Anthony Jeffrey
Stephen Scott
David Nelson
Boston Lynch
FAQ Of Customer
Uzmetkombinat is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Steeler™ is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Steeler™ is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Steeler™ is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Steeler™ is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Get In Touch
“ During the time I have worked with SCG on this project, I have found Mike Campbell and his team to be highly knowledgeable and results-driven. Based on preliminary pilot testing and a strong understanding of subsurface. conditions, in particular fractured bedrock environments. ased on their work on this project. "
Derek AuCoin
Defence Construction Canada
“ For over 10 years working with SCG Industries on environmental contaminated sites they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. “
Derek AuCoin
Defence Construction Canada
“ For over 10 years working with SCG Industries on environmental contaminated sites they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. “
Derek AuCoin
Defence Construction Canada
“ For over 10 years working with SCG Industries on environmental contaminated sites they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. “
Derek AuCoin
Defence Construction Canada